Putting trains in service after moving them from a siding

Here's a place where you can talk about No Limits, ask for help as well as post your creations so everyone can take them for a ride.

Moderator: illinois

Post Reply
bradhig
Hyper Coaster Rider
Posts: 400
Joined: Wed Jul 12, 2006 10:35 pm

Putting trains in service after moving them from a siding

Post by bradhig » Sun Jan 19, 2014 6:49 pm

On Dive Park I went into manual mode and moved the third train out of the storage shed. After I lined up the switch train with the main track the ride wouldn't let me put it back into auto mode. It kept saying each train must be on a block and the trains were on separate blocks. One in the station ,on on the splash down section ,and one on the brake run. Am I doing something wrong?

Post Reply

Who is online

Users browsing this forum: Google [Bot] and 2 guests